La Mirage Condo in Port Aransas, TX
Scope of work:
Master Bedroom to have 3 Flush Lighting installed and New Fan install
- Paint Laundry room Cabinet
- Install two Flush Mount Lighting in Laundry Room
- Clean Hot Water heater room and Paint
- Quartz Counter Top for Folding table
- Install Flush Lighting in Kitchen 3 total
- Paint Kitchen Cabinets two tone
- Remove kitchen divider wall within Structure ability
- Install 2 Flush Mount Lighting in Kitchen
- Install Quartz counter tops with 4" backing to extend up at sink to bottom of bar area. New countertop for bar.
- Install 6 flush mount 4" Lighting in living area
- Door to be inspected and new rollers ordered.
- Paint patio Chairs to Owners Color Choice
- All Ceiling to be Painted due to new Light fixtures
Master Bedroom to have 3 Flush Lighting installed and New Fan install
- Master Bathroom door to be opened 4-5 inches. New Countertops and Paint Vanity. New Raised Sink. Picked out by Customer
- Install new Toilet and fix water Line valve in wall.
- Second Bed Room Change out Fan, install two 4" Flush Lights, Move Pug for TV up the wall.
- Second Bathroom remove Vanity and install new Vanity and counter top. Vanity provided by Owner.
- Install Light in shower to tie in to Fan "Second Bedroom.